summaryrefslogtreecommitdiff
path: root/test
AgeCommit message (Collapse)Author
2006-02-28Add References: support to autoreply.Philip Hazel
2006-02-23Make server prompts available in $auth<n> when plaintext is running as aPhilip Hazel
client.
2006-02-22Limit retry_interval_max to 24h to avoid overflow problems.Philip Hazel
2006-02-20One final test added to the test suite.Philip Hazel
2006-02-16Panic-die if .include specifies a non-absolute path.Philip Hazel
2006-02-16Update the test suite's runtest script to allow for ClamAV support viaPhilip Hazel
TCP sockets.
2006-02-16Code tidies to remove stuff that was needed only for the old test suite.Philip Hazel
Also, use -odi for bounces when in the test harness, unless queue_only is set.
2006-02-14Allow slashes in the dns_check_names_pattern default value.Philip Hazel
2006-02-14Omit spaces between name and colon in header syntax verify errorPhilip Hazel
message.
2006-02-14Add log selector sender_verify_fail.Philip Hazel
2006-02-13Fix "(during SMTP connection from NULL)" bug.Philip Hazel
2006-02-13Add control=freeze/no_tell feature.Philip Hazel
2006-02-13Better debug diagnosis of malformed IPv4 addresses.Philip Hazel
2006-02-10Give error if overflow in quota setting in appendfile on a 32-bitPhilip Hazel
system; make Exim output off_t size for -bV so tests can be appropriate.
2006-02-10Add $auth1, $auth2, $auth3 variables.Philip Hazel
2006-02-09If a message is older than the "first failed" time when computing aPhilip Hazel
retry, use the message arrival time instead of the "first failed" time.
2006-02-08Don't add From: or Reply-To: to quota warning messages if they arePhilip Hazel
provided by quota_warn_message.
2006-02-08Fix retry key bug for pipe, file, or autoreply deliveries.Philip Hazel
2006-02-07Always do explicit A/AAAA lookups; no longer make use of the additionalPhilip Hazel
RR section from MX/SRV lookups.
2006-02-07Improve queryprogram behaviour when not running as root.Philip Hazel
2006-02-07File somehow got omitted in recent commit faffing.Philip Hazel
2006-02-07Hopefully the final lot of test files.Philip Hazel
2006-02-07More test commits.Philip Hazel
2006-02-07More test files.Philip Hazel
2006-02-07More new test committing.Philip Hazel
2006-02-07More new test committing.Philip Hazel
2006-02-06CVSing the test suite.Philip Hazel
2006-02-06CVS-ing the new test suite.Philip Hazel